The Fort Valley Experimental Forest (FVEF), established in 1908, is the Nation’s first Forest Service research facility. The NFF seeks a contractor to conduct up to 1,656 acres of tree thinning and stand improvement work on the FVEF within the Flagstaff Ranger District of the Coconino National Forest. Treatments include mastication, hand thinning, and piling of live and dead Ponderosa pine trees up to 9 inches in diameter at breast height (DBH). The primary objectives of the FVEF restoration project are to:
-
- Reduce the risk of uncharacteristic wildfire by lowering stand density and removing ladder fuels, and
- Improve overall forest health by reducing inter-tree competition and enhancing the growth, vigor, and resilience of residual trees.
A Pre-bid tour is scheduled for October 22, 2026 at 10am AZ Time. Interested parties are encouraged to attend the pre-bid tour to better understand the scope of work and expectations. To attend the Pre-Bid Tour, bidders must contact Chad Kim ([email protected]) no later than October 21, 2026 to be placed on the RSVP list and receive meeting details.
Note: A second pre-bid tour is scheduled for October 28, 2026 at 10am AZ Time. To attend the Pre-Bid Tour, bidders must contact Chad Kim ([email protected]) no later than October 27, 2026 to be placed on the RSVP list and receive meeting details. Additionally, the bid deadline has been extended to November 12, 2026.
Deadline:
Responses should be emailed by November 12, 2026.
Contact:
Chad Kim, [email protected]
Share:
Download MaterialsIn collaboration with the Bird Conservancy of the Rockies (BCR), the NFF is seeking a contractor to conduct service work, including forest thinning and mastication operations, across 81.1 acres of private lands adjacent to the San Isabel National Forest in Chaffee County, CO. The goal of this work is to reduce hazardous forest fuels that have accumulated due to a century of fire suppression and human development in fire-dependent ecosystems. Forest treatments will occur in mixed-conifer stands (Douglas fir, lodgepole pine, ponderosa) and ponderosa pine stands. Both tree harvest and mastication are expected to occur.
A mandatory pre-bid project tour will be held on November 3, 2026. To receive logistical details for the tour, contractors must RSVP to [email protected] by November 2, 2026. Those who RSVP will receive a georeferenced project area map to reference during the tour.
Deadline:
Responses should be emailed by November 13, 2026.
Contact:
Shannon Smith, [email protected]
Share:
Download MaterialsThe National Forest Foundation (NFF) is seeking a qualified contractor to complete a hazardous fuel reduction project in Boundary County, Idaho, on the Idaho Panhandle National Forest. The project encompasses approximately 130 acres across two treatment units located approximately 6 miles southeast of Moyie Springs, Idaho.
Site Visitation
Note: An in-person tour will be held on November 12, 2026.
Please RSVP at [email protected] by November 11, 2026 to attend.
11/16/26: Added Q&A
Deadline:
Responses should be emailed by November 16, 2026.
Contact:
Wyatt Trull, [email protected]
Share:
Download MaterialsThe National Forest Foundation (NFF) is seeking a qualified contractor to complete the King Kong Fuels project on the Kootenai National Forest in Lincoln County, Montana. The project encompasses approximately 235 acres across five treatment units located approximately 3.5 miles northeast of Troy. Work includes hand slashing and slash scattering on approximately 121 acres in Units A and B, and hand thinning and hand piling on approximately 114 acres in Units F1, F2, and F8.
Site Visitation
Site visitation is not required, but it is highly encouraged if conditions allow.
An in-person tour will be held on November 12, 2026.
Please RSVP at [email protected] by November 11, 2026 to attend.
10/22: Added Appendix D: Food Storage Order
11/16: Added Q&A
Deadline:
Responses should be emailed by November 16, 2026.
Contact:
Wyatt Trull, [email protected]
Share:
Download MaterialsThis prospectus is to provide potential bidders with preliminary and general project information related to conifer removal and biomass treatments planned for the Downieville Phase II Project located around the community of Downieville, CA, north of State Highway 49, in the Yuba River Ranger District of the Tahoe National Forest.
Please note: a significant portion of this project is planned for helicopter yarding operations. Alternative methods may be considered in select units, if feasible.
This prospectus also identifies a day and time of a project field tour. Staff from the National Forest Foundation and US Forest Service will be available to answer questions about the project. Interested parties are encouraged to attend this tour and further investigate the project before the official Request for Proposals advertisement in winter 2027 (this bidding period is estimated, and the opening date for an official bidding period is not yet determined). The field tour will provide a guided introduction to the area, and help potential bidders better understand ground conditions before the official bidding period opens.
Field Tour
Meeting day/time: November 18, 2026, at 10:00am.
Meeting location: Downieville USFS Fire Station (10 Smokey Ln, Downieville, CA 95936)
Please RSVP to Tyler Walsh ([email protected]) by November 16th, 2026.
Deadline:
Responses should be emailed by November 16, 2026.
Contact:
Tyler Walsh, [email protected]
Share:
Download MaterialsThis Request for Proposals is for project planning and oversight services related to the application of herbicides on the Tahoe National Forest. The herbicide project manager will coordinate closely with the NFF and United States Forest Service (USFS) representatives to review multiple disparate National Environmental Policy Act (NEPA) decisions that authorize herbicide treatment to inform and create a singularly organized and comprehensive forest-wide program of work.
Deadline:
Responses should be emailed by November 18, 2026.
Contact:
Maggie Cummings, [email protected]
Share:
Download MaterialsThe Dakan Road Project is a forest restoration and hazardous fuels reduction effort located on approximately 492 acres across 13 private properties west of Castle Rock, Colorado, primarily along Dakan Road and Majestic Mountain Road. The project area contains a mix of dense mixed conifer forest, ponderosa pine stands, and Gambel oak woodlands where high tree densities, ladder fuels, and accumulated vegetation have increased wildfire risk, reduced forest health, and heightened susceptibility to insect and disease outbreaks. The selected contractor will implement hazardous fuels reduction and forest stand improvement treatments across approximately 492 acres of private land. The selected contractor will also be expected to evaluate site conditions, operate safely within complex terrain, coordinate with the Colorado State Forest Service as project administrator, and complete treatments in accordance with project specifications.
A mandatory pre-bid site tour will take place November 4, from 9:00am-12:00pm MST. Attending the pre-bid tour is required to be eligible to submit a proposal.
Joe Gray ((970) 495-2278, [email protected]), CSFS Lead Forester, will be running the tour. Please contact Joe with any questions and to let him know if you plan to attend.
Deadline:
Responses should be emailed by November 18, 2026.
Contact:
Amanda Knauf, [email protected] and Joe Murphy, [email protected]
Share:
Download MaterialsThe Russel Valley Fuels Reduction Project consists of approximately 936 acres of mastication and 180 acres of hand thin and treat.
Field Tour
Meeting day/time: Friday, November 20, 2026, at 10:00am.
Meeting location: Junction of Dog Valley Rd and Old Reno Rd, 39°23’51.8″N 120°08’56.2″W
Deadline:
Responses should be emailed by November 20, 2026.
Contact:
Mitch Aikin, [email protected]
Share:
Download MaterialsThe National Forest Foundation (NFF) is soliciting bids for multiple Fuels Projects located on the Tally Lake, Swan and Hungry Horse/Glacier View Ranger Districts of the Flathead National Forest. Worked advertised in this solicitation will include but is not limited to: Hand Pre-Commercial Thinning (PCT), understory removal (USR), hand chainsaw thinning, hand piling, lop and scatter, machine-based understory removal or mastication, and excavator or machine piling.
Prebid Tour and Access on Private Lands
Frozen Moose Sagebrush in Polebridge Gate Code: Contact Brad French [email protected] for code prior to leaving cell service in town. Optional Prebid Tour November 9 at 12:00 pm meet at locked gate on map Kintla Ranch Rd Polebridge, MT (no cell service).
Red Owl Fuels in Bigfork crosses private property for access. Park in designated parking areas shown on map. Contact Brad French [email protected] a prior to needing access for bidding visits and or working so he can notify the landowner prior to work beginning. Optional Prebid Tour November 10 at 12:00 pm at Red Owl Road/Hwy 83 Ferndale, MT.
Updates:
11/6/26: Adjusted anticipated period of performance on page 4. Updated Page 3 Beaver Lake Fuels to 39 acres. Combined bid item 2b with 1.
11/16/26: Updated Page 9 of Maps Item 6 Beaver Lake PCT Slash & Machine Pile from 117 acres to 39 acres.
Deadline:
Responses should be emailed by November 20, 2026.
Contact:
Brad French, [email protected]
Share:
Download MaterialsThe selected Contractor will collaborate with the Yuba River Ranger District (YRRD), NFF, and the oversight forester to implement forest health treatments across the project area. The total project area is approximately 126 acres, consisting of approximately 2,512 trees marked for removal.
Project Tour:
The NFF and the USFS will host a project tour to help interested contractors gain a better understanding of the project and field any questions. This tour is scheduled to be conducted on Wednesday, October 21, 2026, and if this date changes, bidders will be notified. Plan to meet at the Yuba Pass – CA State SNOPARK (off State Highway 49 in Calpine, CA 96124; Google map link) at 10:00 AM (PDT). Please send an email to [email protected] by Friday, October 16, 2026, if you would like to attend the tour.
Note: The bid submission deadline has been extended to November 18, 2026.
11/10/26: Deadline has been extended to November 23, 2026. Q&A was added and Appendix E.1 and Appendix F have been updated.
Deadline:
Responses should be emailed by November 23, 2026.
Contact:
Tyler Walsh, [email protected]
Share:
Download MaterialsNFF is seeking a commercial Face to Face (F2F) canvassing vendor partner to acquire new monthly sustainers for the recurring giving program. The selected vendor will recruit, hire, train, and manage canvassers who engage the public in person on NFF’s behalf, represent NFF’s mission and brand, and secure recurring gifts. The vendor will be responsible for market selection and launch, fundraiser performance management, quality control of donor interactions and data, donor experience, and regular reporting to NFF.
Deadline:
Responses should be emailed by November 25, 2026.
Contact:
Share:
Download MaterialsThis Request for Quotes seeks a contractor(s) to perform hazardous
fuel reduction through mastication across multiple units within the Katkee Mastication project on the Idaho Panhandle National Forest.
The selected contractor will be responsible for performing approximately 116 acres of mechanical mastication, with possible supplemental hand slashing where ground is deemed inoperable.
Site Visitation
Note: An in-person tour will be held on November 12, 2026.
Please RSVP at [email protected] by November 11, 2026 to attend.
11/16/26: Added Q&A
Deadline:
Responses should be emailed by November 25, 2026.
Contact:
Wyatt Trull, [email protected]
Share:
Download MaterialsThe National Forest Foundation in coordination with the United States Forest Service (USFS) seeks proposals to stabilize 14.4 miles of the Fremont National Recreation Trail (#160). Trail stabilization includes logging out, clearing and grubbing, and full tread restoration.
Deadline:
Responses should be emailed by November 30, 2026.
Contact:
Aaron Rutledge, [email protected]
Share:
Download MaterialsThe selected contractor will be responsible for hand thinning and piling of fuels in accordance with the project specifications. Work on this project will include manual hand thinning of fuels with chainsaws and piling of cut fuels.
Optional Bid Tour
An optional bid tour will be held on Tuesday, November, 17th, 2026 at 1:00pm.
Meet at the parking area on the west side of CA-89 approximately ¼ mile south of the Gold Lake Highway. We will drive into the project area from the meeting location.
Coordinates: 39.75197725375038, -120.5972200673597
Google maps link: https://maps.app.goo.gl/EAkZNCyeEpyQ9vjc8
Deadline:
Responses should be emailed by November 30, 2026.
Contact:
Jeff Gicklhorn, [email protected]
Share:
Download MaterialsThe NFF and the United States Forest Service (USFS), Arapaho and Roosevelt National Forests and Pawnee National Grassland (ARP), are partnering to reconstruct the Jacks Gulch Campground. The campground is located approximately 40 miles west of Fort Collins, Colorado, within the Canyon Lakes Ranger District on the ARP. The project will reconstruct existing Jacks Gulch campsites and add new sites, modernize the campground to meet current USFS standards, and enhance the public recreation experience for users. The overall reconstruction includes up to approximately 90 campsites that are spread across 4 loops (two existing loops, an equestrian loop, and a new loop), two group sites, and associated utilities including electric and water. There are two options for work at the Columbine Loop, of which only one will be awarded. There are also additional optional bid items. The project will require close coordination with the Poudre Valley Rural Electric Association (PVREA) for electrical installation (see Appendix G. PVREA Narrative for more information).
Work will include: repairing, upgrading and adding infrastructure and amenities, including but not limited to: improving and expanding roads and parking areas; resurfacing road and campground spurs; realigning and adding new campsites (ranging from deluxe sites to standard sites and walk-in sites); improving campground with new facility pads and trails; replacing campsite and site furnishings, such as vault toilets, picnic tables, fire rings, , dumpsters, stairs, kiosks, gates, and signs; reconstructing water and electrical systems; installing new wells and pumphouse; and installing equestrian infrastructure and amenities.
A mandatory onsite pre-bid conference will be held on Tuesday, October 27, 2026. If you would like to attend the pre-bid onsite conference, please RSVP to Elise Martinez ([email protected]) on or before Thursday, October 22, 2026, by 12 pm MT.
Deadline:
Responses should be emailed by December 11, 2026.
Contact:
Elise Martinez, [email protected]
Share:
Download MaterialsThis Request for Proposals is for design and construction services related to a boardwalk, puncheon, barrel system outhouse, and cabin foundation; as well as complete construction of the Port Chalmers cabin and associated site amenities, including outdoor seating area, deer hang, and woodshed.
NFF and USFS will host a virtual pre-bid meeting to answer relevant questions on Tuesday, November 17th, 2026 at 1 pm AKST. Please email [email protected] to rsvp and receive the meeting link.
Deadline:
Responses should be emailed by December 11, 2026.
Contact:
Telsche Overby, [email protected]
Share:
Download MaterialsThis Request for Proposals is for construction services related to the North Umpqua Trail Bridges Calf Creek Section project, located on the Umpqua National Forest. Work on this project will include the supply of 3 steel bridges to be installed in remote tail locations along the North Umpqua Trail.
Deadline:
Responses should be emailed by December 11, 2026.
Contact:
Amber Schat-Kenig, [email protected]
Share:
Download MaterialsThe selected Contractor will perform hazardous fuels reduction and forest health treatments on approximately 841.5 acres within the North Big Bear area of the San Bernardino National Forest.
Work will consist of thinning small-diameter trees and ladder fuels, removing designated non-saw timber and woody biomass, pruning residual trees, treating brush, and managing activity-generated slash through piling, mastication, or lop-and-scatter methods.
Deadline:
Responses should be emailed by December 18, 2026.
Contact:
Brian Robey, [email protected]
Share:
Download MaterialsHurricane Michael in 2018 and subsequent tropical storm runoff have impacted bank stability of the Apalachicola River along the Prospect Bluff heritage site. The project aims to stabilize the approximately 1500-2000 square feet and 150 linear feet of riverbank, directly below bench or below mean high water line, and protect it from further erosion. The project was conceptualized using nature-based solutions of structural and vegetation installations. NFF, in partnership with the USFS, is seeking a qualified architectural and engineering contractor for engineering design to restore and stabilize the shoreline of Prospect Bluff. While the focus of this RFP is for engineering design, NFF is open to design – build proposals. Respondents may submit proposals for either: (1) Design Services Only, or (2) Design-Build Services. Bidders may submit a proposal for one option or both; however, each option must be submitted separately and clearly identified. The NFF will evaluate all proposals and select the delivery method that best serves the project’s needs and represents the best value.
A mandatory pre-bid site visit will be scheduled for December 9, 2026 at 10:30 AM EST. The meeting location will be the Fort Gadsden/Prospect Bluff complex. NFF and USFS representatives will be at the Fort Gadsden Road turnoff and lead the tour. Cell reception is limited. Please confirm attendance to the POC listed below by close of business, December 7, 2026. A sign-in sheet will be available. Proposals will only be considered from firms in attendance.
Updates:
11/10/26: Modified Licensing requirements on Page 4. Added estimated competitive price range for a design build on page 2
Deadline:
Responses should be emailed by January 12, 2027.
Contact:
Austin Justis, [email protected]
Share:
Download Materials