Forestry, Veg. Mgmt, & Restoration | Due January 12, 2027
Prospect Bluff Shoreline Stabilization Design Apalachicola National Forest, Florida
Hurricane Michael in 2018 and subsequent tropical storm runoff have impacted bank stability of the Apalachicola River along the Prospect Bluff heritage site. The project aims to stabilize the approximately 1500-2000 square feet and 150 linear feet of riverbank, directly below bench or below mean high water line, and protect it from further erosion. The project was conceptualized using nature-based solutions of structural and vegetation installations. NFF, in partnership with the USFS, is seeking a qualified architectural and engineering contractor for engineering design to restore and stabilize the shoreline of Prospect Bluff. While the focus of this RFP is for engineering design, NFF is open to design – build proposals. Respondents may submit proposals for either: (1) Design Services Only, or (2) Design-Build Services. Bidders may submit a proposal for one option or both; however, each option must be submitted separately and clearly identified. The NFF will evaluate all proposals and select the delivery method that best serves the project’s needs and represents the best value.
A mandatory pre-bid site visit will be scheduled for December 9, 2026 at 10:30 AM EST. The meeting location will be the Fort Gadsden/Prospect Bluff complex. NFF and USFS representatives will be at the Fort Gadsden Road turnoff and lead the tour. Cell reception is limited. Please confirm attendance to the POC listed below by close of business, December 7, 2026. A sign-in sheet will be available. Proposals will only be considered from firms in attendance.