Recreational Infrastructure | Due September 11, 2026
Wolverine Creek Trail Bridge Chugach National Forest, Alaska
This contract is to provide the design, engineering (as applicable), fabrication, delivery, and installation of a superstructure and substructure crossing over the Wolverine Creek drainage in accordance with this RFP and attached appendices. Steel FRP bridge designs shall be stamped by an Alaska Professional Engineer (“AK PE”) as required herein. The crossing substructure shall consist of concrete with a robust connection to bedrock. The superstructure may be timber, FRP, or steel. It is the responsibility of the selected Contractor to verify subsurface conditions and determine the most practical and economical crossing structure that complies with the USFS Region 10 Standard Drawings (Appendix C) and all other applicable project specifications. Survey and subsurface exploration has not been conducted at this site. Field fitting of the bridge is permitted.
Virtual Pre-Bid Meeting
A virtual, pre-bid meeting will be held on August 21, 2026. NFF and Chugach National Forest staff will be present to answer any questions about the project. The meeting will begin at 9:00 AM AKT and be hosted through Microsoft Teams. Attending the virtual, pre-bid meeting is encouraged, but not required, to submit a bid. If you would like to attend, please RSVP to [email protected] by 5:00 PM AKT on August 19, 2026, to receive meeting details. All questions and answers from the virtual, pre-bid meeting will be posted as an addendum to this RFP by August 28, 2026.
Deadline:
Responses should be emailed by September 11, 2026.